Name
Cat Lai Newport Port
Location
Cat Lai Ward, Thu Duc City, Ho Chi Minh City
Architect
First Investment & Design Consultancy Joint Stock Company
Client
Saigon Newport Corporation
Area / Size
10MVA + 14MVA
Development Type
Diesel Power Plants
Along with the modernization of Cat Lai Newport Port, the construction of new standby power plants 1.1 and 4.1 for the 22kV medium voltage grid in the entire region is one of the top priorities. pros Construction Consultancy Limited provided the complete design of the low-voltage generators and paralleling switchgear are integrated with the load management system at the low voltage level, step-up to the 22kV medium voltage level to serve as a medium voltage backup power source when the national grid feeds have failures. The projects started in July 2024 and are expected to be completed in December 2025.