    Design, check the design of power infrastructure projects

    1. Design the diesel power plant projects to supply backup power to the medium voltage grid 

    • The medium voltage generators are integrated with the power management system to provide maximum utilisation of the available generator capacity, and allows the paralleling operation of medium voltage generators with the utility feed within 60 seconds (this is the closed transition soft-load power transfer time for the utility feed when the utility feed has been restored).

    • The low voltage generators and paralleling switchgear are integrated with the power management system to provide maximum utilisation of the available generator capacity at low voltage level, up-step to medium voltage level to serve as a medium voltage backup source when the utility feed is out of power. 

    • Depending on the model of the group (groups) of generators operating in parallel, the number of circuit breakers of power supply lines to the loads according to the priority levels and load characteristics to choose the solution of integrating the load management system or integrating the power management system or not.

    2. Design of the projects of transmission lines and substations with voltage levels up to 35kV but are not limited on capacity.